Start with your flat and a written scope

Keep the correct unit plan, project-specific renovation guidance and the contractor’s proposed scope together. HDB advises owners to check any specific guidelines for their flat through MyHDB Page. Another owner’s approved layout is not approval for yours.

Give each proposed job a reference: room, location, work and plan version. Separate a layout idea from the work needed to build it. If the description is only “kitchen package”, ask what it includes before treating the scope as settled.

HDB: owner responsibilities and renovation rules ↗

Check who will actually carry out the work

HDB requires contractors listed in its Directory of Renovation Contractors (DRC), including for renovation work that does not need HDB approval. Check the actual executing business through the official directory, rather than relying on a logo or a salesperson’s assurance.

Keep the business name and directory reference beside the contract. HDB’s permit guidance also identifies work-specific licensed professionals and circumstances requiring a Qualified Person. Ask which role applies to each job; a general contractor listing does not establish every specialist qualification.

HDB: permit application and professional roles ↗

Keep the four records separate

A quotation describes a commercial proposal. A directory listing identifies a listed contractor. An application records a request. A granted permit is a different record, with its own scope and conditions. Keep each one under its correct status.

HDB says owners must authorise their contractor’s electronic application, including the signed acknowledgement. Receiving a submission notification is not the same as receiving approval. Use HDB’s official route to view and check a permit once granted.

HDB: permit application and professional roles ↗

Make a work-by-work approval sheet

Use columns for job reference, proposed work, responsible contractor or professional, applicable guideline, approval needed, document received, condition and next action. Keep an uncertain requirement open and ask HDB or the appropriate professional; this is not an exhaustive permit checklist.

Fictional example: a proposed bedroom-wall change has a quotation and a marked plan but no written approval. Mark it “do not start; confirm approved scope”. HDB requires prior written approval for wall demolition or hacking. The example does not establish that any particular wall can be altered.

HDB: owner responsibilities and renovation rules ↗

Read the conditions before the start date

For work needing a permit, HDB says to obtain it before that work begins. Compare the actual approved scope and plan with the job being scheduled. Check the applicable work periods, notices and other conditions in the current guidance and documents; do not substitute a generic timetable.

If the design changes or the documents disagree, ask the contractor and HDB what approval or clarification is required before the changed work. Work not requiring a permit must still meet HDB guidelines. A planned start date does not resolve a missing requirement.

HDB: permit application and professional roles ↗

Keep the owner’s checks and the next step visible

Keep the scope, contract, relevant approvals, conditions and dated clarifications together. Assign each open item an owner and next action. HDB makes flat owners responsible for ensuring their contractors follow its rules; outsourcing the application does not remove that responsibility.

Use the separate defects guide for pre-renovation condition records and BSC follow-up, and the funding roadmap for illustrative cash planning. Where To BTO organises published project facts and planning questions; it does not recommend contractors, certify work or approve a renovation.

HDB: owner responsibilities and renovation rules ↗